
Denver Eagle, US
The investment in Denver Eagle in 2010 marked John Laing’s entry into the US P3 market and was the country’s first public-private partnership transit project. It was signed by the Denver Transit Partners (DTP) consortium and client, Regional Transportation District in August 2010.
1st US P3 transit project
3 new commuter lines
35 miles of commuter rail
50% John Laing ownership interest

The project consists of the design, build, finance, maintenance and operation (“DBFOM”) of three new commuter rail lines to expand transit across the Denver metropolitan area, including a line connecting Denver International Airport and Denver Union Station. This includes approximately 35 miles of commuter rail transit lines, rolling stock, a commuter rail maintenance facility and systems and track improvements to Denver Union Station.
Strong operational track record
As a 50 per cent equity owner in Denver Transit Partners (the “Consortium”) and active investor, John Laing appointees hold key positions within the project, including the Chief Executive, as well as at the Board level. The Group has played an active role in the successful delivery of the project through construction and into operations. The third and final line opened in April 2019, and Denver Eagle is now building a strong operational track record. In late 2020, the project was successfully refinanced, reflecting the completion of construction and strong operational performance. As a result, the project’s debt service costs have been reduced, with the resulting savings shared with Regional Transportation District.

The project is designed to help reduce congestion and provide a safe, affordable and reliable transport option for the 2.8 million people living in Denver’s growing metropolitan area. The Consortium has had a strong focus on local procurement, and the project has contributed to economic growth in the region, with over US$900 million spent in the local economy to date.
For further information on Denver Eagle, please view this pdf.
I-4 Ultimate Project, US
The I-4 project plays a significant role in enhancing both safety and mobility for I-4 users, and reduces travel times in the heart of Florida.

Denver Eagle, US
The investment in Denver Eagle in 2010 marked John Laing’s entry into the US P3 market and was the country’s first public-private partnership transit project.

Hurontario Light Rail Transit Project, Canada
In 2019, Mobilinx, in which John Laing has a 35 per cent equity interest, achieved financial close on the design, build, finance, operation and maintenance of the Hurontario Light Rail Transit Project.

MBTA Automated Fare Collection 2.0, US
The project is being delivered as a P3, with the consortium appointed to design, build, operate and maintain a next-generation fare payment system in Greater Boston.

Sunraysia Solar Farm, Australia
Sunraysia has total capacity of 255 MW and is located in New South Wales.

Sydney Light Rail, Australia
The SLR project consists of the design, construction and financing of the light rail network, and its operation and maintenance.
