Live Oak, US
Live Oak is an operational 200MW onshore wind farm located near San Angelo, Schleicher County, Texas, USA. It has been operational since December 2018 and consists of 76 Siemens Gamesa SWT-2.625-120 turbines (each with a nominal capacity of 2,625 kW).

The wind farm was developed by Engie who also provide a 10-year PPA for the project.
The project is connected via an onsite 34.5/345kV substation with the project also owning 4.5 miles of 345kV overhead line before connecting to the Electric Transmission Texas Big Hill 345kV substation.
It provides renewable energy through short-term retail supply contracts to aggregations of small and midsized customers.
I-4 Ultimate Project, US
The I-4 project plays a significant role in enhancing both safety and mobility for I-4 users, and reduces travel times in the heart of Florida.

Denver Eagle, US
The investment in Denver Eagle in 2010 marked John Laing’s entry into the US P3 market and was the country’s first public-private partnership transit project.

Hurontario Light Rail Transit Project, Canada
In 2019, Mobilinx, in which John Laing has a 35 per cent equity interest, achieved financial close on the design, build, finance, operation and maintenance of the Hurontario Light Rail Transit Project.

MBTA Automated Fare Collection 2.0, US
The project is being delivered as a P3, with the consortium appointed to design, build, operate and maintain a next-generation fare payment system in Greater Boston.

Sunraysia Solar Farm, Australia
Sunraysia has total capacity of 255 MW and is located in New South Wales.

Sydney Light Rail, Australia
The SLR project consists of the design, construction and financing of the light rail network, and its operation and maintenance.